Quality problems rarely begin on the production line. They begin earlier, in the gap between the sample the client approved and the specification the factory was given. If those two things differ, every unit that follows will differ with them.
Nothing goes to production until the sample matches the spec
We test samples in China, where tests run faster than shipping a sample to your market and waiting for a verdict. Every gap against the spec is found before production, not after the goods have shipped. Where the sample is wrong, the factory corrects it and we test again.
Once approved, it becomes the standard
When the client approves a sample, it is no longer a sample. It becomes the golden sample: the reference against which every unit made afterwards is checked. It is stored, documented and travels with the project.
- Inspections at the factory happen at the key points of production, against the golden sample.
- Disagreements are settled by the sample, not by memory.
- A new order a year later is made to the same standard, without starting over.
Why we build it into every round
On the agricultural component project for a Spanish client, quality checkpoints were built into each sample round, not added at the end. Moulds were reviewed and revised before any production commitment was made, and the client approved each stage before the next began.
It is slower on paper. In practice it is the cheapest quality control there is, because the expensive mistakes are the ones found last.